CK-104 LONG LEAD Part with NSN 5910-00-113-5499 by Crl Components Inc – Buy Now

Part Number: CK-104 LONG LEAD
Alternate P/N: CK104LONGLEAD
NSN: 5910-00-113-5499 (5910001135499)
Manufacturer: Crl Components Inc
CAGE Code: 71590
NIIN: 001135499

Good news, part number CK-104 LONG LEAD with NSN 5910001135499 is now available. This part number CK-104 LONG LEAD is manufactured by Crl Components Inc and is described as Capacitor Fixed Cer. Do you need a quick quote for CK-104 LONG LEAD? We can help! Our ready-to-ship stock is comprised of over 2 billion NSN items.

CK-104 LONG LEAD : RFQ Form “*” Required fields are compulsory

NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item Description:

Capacitor Fixed Cer

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
Ck-104 Long LeadB1CA

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION-10.00/+10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION

  Relevant NATO Parts to CK-104 LONG LEAD

CK 0009582 K
Hardinge Bros Inc
27239
Motor Alternating C
CK-0011K
Other C
CK-003U
Other C
CK 006.5040
Rohde And Schwarz Usa Inc
82199
Capacitor Fixed Met
CK-04
Other C
CK-07
Other C
CK 1.5
Other C
CK 1.5MM2 100M
Other C
CK 1.5MM2 100M BLACK
Escable
CK 1 8 PK4
Festo Corporation
D8293
Adapter Straight Tu
CK-1000SLIDE
Ck Power Products Corp
9U556
CK 100P500V
Other C
CK-103
Bc Components
56699
CK-1031
Other C
CK 1035
Lorlin Electronics Ltd
K1105
Switch Rotary
CK-1039-29 A1
Honeywell International Inc
55973
Motor Control
CK-1039-29 A1
Goodrich Corporation
99551
Motor Control
CK-1039-29 A1
Honeywell Intl Inc
19315
Motor Control
CK-104
Bc Components
56699
CK-104
Crl Components Inc
71590
CK-104
Phillips Industries Inc
0J690
CK-1040
Other C
CK 1042
Other C
CK-1049
Other C

Semiconductor's Certifications and Memberships

Thank You for Visiting NSN Supplies!

We Hope You'll Remember Us the Next Time If You’re Looking for NATO, Drone Parts.

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.